CASE · Construction

Mid-size Constructor A
Apartment new-build worksite

Smart watches and helmet beacons were deployed at a high-elevation worksite with significant fall and heat-stroke risk, establishing a real-time hazard monitoring framework.

OVERVIEW

Worksite overview

Industry
Construction
Scale · Duration
200 workers · 6 months
Deployment configuration
50 watches · 80 helmet beacons · 50 belt beacons · 30 fixed beacons · 12 geofence zones

Constructor A was building a 25-floor apartment block in the greater Seoul area. With subcontractor personnel rotating frequently and elevated work concentrated throughout, the company was looking for a system to prevent fall and heat-stroke incidents before they occurred. SenseZero conducted a 6-month PoC using a 4-layer combination of smart watches, helmet beacons, belt beacons, and danger-zone beacons — demonstrating a 32% reduction in high-risk alerts and a 57% reduction in response time.

KPI

Key outcomes

32%
High-risk alerts reduced
57%
Response time cut
200명
Workers monitored simultaneously
12구역
Geofence danger zones

CHALLENGES

Problems to solve

  • 01Frequent subcontractor personnel rotation made it difficult to track safety training completion
  • 02Site managers could not check in real time whether workers at height were wearing their harnesses
  • 03No early-detection system for heat-stroke risk during summer months
  • 04Structural delay in responding within the golden window when a fall occurred

SOLUTION

Solutions deployed by SenseZero

  • S.01Watch-based heart-rate and activity monitoring for early detection of heat-stroke and overwork signs
  • S.02Helmet and belt beacons for real-time detection of hard-hat wearing status and danger-zone entry
  • S.0312 elevated-work zones geofenced — unauthorised entry triggers immediate watch vibration and manager alert
  • S.04Non-response alert after a fall appears on the manager dashboard within 5 seconds

TIMELINE

Deployment timeline

Week 1~2
Preparation
Site-plan analysis, design of 12 geofence zones, layout plan for 200 beacons
Week 3~4
Installation
Beacon and watch installation, safety training and system induction for 200 subcontractor workers
Month 2~5
Operations
Real-time monitoring + weekly report publication. Alert thresholds adjusted twice based on site feedback
Month 6
Validation
Comparison of prior 3-month vs PoC 6-month incident and alert data, KPI calculation
◆ END OF FEED

Want to apply this to a similar worksite?

We will propose a PoC configuration matched to your industry, scale, and priority risks.