CASE · Manufacturing

Large Manufacturer B
Smart factory worksite

Beacon-based location tracking and danger-zone alert systems were applied to manufacturing lines with high caught-in and collision accident risk.

OVERVIEW

Worksite overview

Industry
Manufacturing
Scale · Duration
150 workers · 3 months
Deployment configuration
30 watches · 50 beacons · 8 geofence zones

Manufacturer B wanted to reduce caught-in and collision accident risk in a smart factory running many automated machines, while also objectively measuring worker fatigue accumulation. A 3-month PoC using SenseZero's smart watches, fixed beacons, and geofences achieved a 45% reduction in caught-in hazard alerts and a 60% reduction in safety inspection time.

KPI

Key outcomes

45%
Caught-in risk reduced
60%
Inspection time cut
150명
Workers monitored simultaneously
8구역
Equipment danger-zone geofences

CHALLENGES

Problems to solve

  • 01Worker access control around automated equipment such as presses and robot arms was inconsistent
  • 02Fatigue accumulation among repetitive and high-speed line workers could not be measured objectively
  • 03Guard inspection and training history was scattered across paper records, slowing supervisor response
  • 04Post-accident root-cause analysis depended on worker testimony

SOLUTION

Solutions deployed by SenseZero

  • S.018 zones around presses and robots set as geofence danger zones — unauthorised access triggers immediate blocking alerts
  • S.02Cumulative heart-rate and activity monitoring via watch, with rest-recommendation alerts for fatigued workers
  • S.03Automatic recording of guard inspection and training completion history, bulk-downloadable during supervisor inspections
  • S.04When an accident occurs, worker location, heart rate, and work history at that moment are replayed in 5-second increments

TIMELINE

Deployment timeline

Week 1
Preparation
Equipment layout analysis, identification of 8 danger zones, layout plan for 30 watches and 50 beacons
Week 2~3
Installation
Beacon and watch installation, training for 150 workers, digital migration of guard history
Month 1~3
Operations & validation
Real-time monitoring + monthly alert trend analysis. KPI calculated at PoC conclusion